Engineering and planning works

Tank railcar unloading systems require planning on different levels and for different trades.

The most important trades involved are: 

  • Construction work
  • Piping work
  • Structural steel
  • Automation and monitoring systems
  • Data logging systems (temperature-compensated or weight-based)
  • Fire extinguishing systems
  • Track laying
  • Grounding and lightning protection
  • Cables and connecting lines
  • Installation of materials supplied
  • Residue discharge systems
  • Pump stands
  • Transformer stations

The decision about the extent of work has to be taken by the customer.